Skip to content

24/7 Emergency Response Available — (888) 303-5551

OHOH PROPERTY─ MAINTENANCE

Construction & Trades

Deck Maintenance

Resurfacing, waterproofing, SB 326 / SB 721 inspection coordination. One PM, one SLA, one accountable team — across all six SoCal counties.

Service family

Construction & Trades

Self-perform crews, A & B licensed — built right the first time.

─ What you get

Built into every deck maintenance engagement.

  • Site walk and written scope before any crew shows up
  • Single PM accountable for schedule, cost, and quality
  • Photo-documented before/after on every visit
  • Insurance, licensing, and W-2 payroll on every tech
  • Six-county dispatch — same SLA from LA to Ventura
  • One invoice, one COI, one point of escalation

Want depth on this trade?

We're publishing full case studies, scope-of-work examples, and SLA detail for every service. In the meantime, walk your property with a PM — no fee, no obligation.

Schedule the walkthrough

─ Scope of work

How a deck maintenance program runs, phase by phase.

Every construction engagement follows the same disciplined arc — from first walk to quarterly review — so you can compare scope across vendors line by line.

5-phase methodology
  1. 01

    Pre-Construction

    Scope walk, conceptual estimate, constructability review, permit & jurisdictional analysis.

  2. 02

    Design Coordination

    Architect/engineer interface, MEP coordination, value engineering, and submittal log setup.

  3. 03

    Mobilization

    Permits pulled, COIs in place, schedule baselined, site-specific safety plan and SWPPP filed.

  4. 04

    Construction

    Self-perform crews on critical path, daily reports, weekly OAC meetings, RFI & change-order discipline.

  5. 05

    Commissioning & Closeout

    Punch-list, O&M manuals, as-builts, warranty handover, and 11-month walk.

─ Compare programs

Scope and reporting, side by side.

One row per program phase, paired with the reporting artifact tied to it. Print this page, take it to your next vendor walk, and ask them to match it.

5 phases · 4 cadences
#Scope phaseWhat we deliverReporting cadenceArtifact you receive
01Pre-ConstructionScope walk, conceptual estimate, constructability review, permit & jurisdictional analysis.Daily
Superintendent log
02Design CoordinationArchitect/engineer interface, MEP coordination, value engineering, and submittal log setup.Weekly
OAC report + 3-week look-ahead
03MobilizationPermits pulled, COIs in place, schedule baselined, site-specific safety plan and SWPPP filed.Monthly
AIA G702/G703 pay app
04ConstructionSelf-perform crews on critical path, daily reports, weekly OAC meetings, RFI & change-order discipline.At closeout
Warranty + O&M package
05Commissioning & CloseoutPunch-list, O&M manuals, as-builts, warranty handover, and 11-month walk.Rolled into prior cadence

Phases and cadences shown are the Construction & Trades program standard. Scope adapts to property mix and SLA tier.

─ How reporting works

You'll never wonder what happened on site.

Photos, tickets, dashboards, and quarterly reviews — every visit and every dollar is documented. Compare our reporting cadence against any other vendor's proposal.

CadenceArtifactWhat's in it
Daily
Superintendent log
Manpower, weather, deliveries, inspections, safety observations — emailed nightly.
Weekly
OAC report + 3-week look-ahead
Schedule variance, RFI/submittal status, change-order log, photo album.
Monthly
AIA G702/G703 pay app
Cost-to-complete, schedule of values, lien releases, and budget burn-down.
At closeout
Warranty + O&M package
Bound manuals, as-built drawings, attic stock, and 11-month walk schedule.

All artifacts delivered through your client portal — exportable to PDF, CSV, or your CMMS of record.

Ready for deck maintenance on a real program?

Free walkthrough, written findings, no obligation.

Call NowFree Assessment